Project Profile

San Elijo Joint Powers Authority
Perris Union High School District

Location: Cardiff, CA

Market: Municipal Utilities

Project Size: 14,000 Sq Ft

Services: New Construction Commissioning

Status: Completed in 2022

Project Description: The project delivered a new 14,000 square ft., two story, operations office building and site improvements for the San Elijo Joint Powers Authority water reclamation facility. Site improvements included new driveways and parking, hardscape and landscape, perimeter fencing, site lighting, retaining walls and trash enclosure. The project was designed by RNT Architects, IDS Group Mechanical, Electrical and Plumbing, and Landscape by MW Peltz Assoc.

Systems were commissioned based on ASHRAE Guideline 0-2013, Guideline 1.1-2007, AABC (ACG) commissioning procedures, California Title 24 2016 Requirements, and Owner’s Project Requirements. Commissioning was performed through the design, construction, and closeout phases of the project.

Previous
Previous

Liberty High School

Next
Next

Mitchell1 Snapon Corporate Office Building